+44 (0)20 3995 4934 info@lleeza.co.uk
Select Page

Renewable

We apply to these challenging, new sectors all the experience we build along other sector, especially the most challeging and demanding: Offshore construction and Hook Up phases, major Turn Around on the Upstream OIl fields, Fast Track Projects.

We approach Wind farm, Cogeneration , Biogas Projects with the same attitude and respect we gave to our most challenging Offshore and Onshore traditional Projects: those project required a perfect Preplan Attitude, toegether with the capacity of dig, evaluate and manage a range of difficulties that vary from the logistic in remote areas to the multi cultural work place site, and with , many times , of to the most severe wheater conditions, from -40°C to + 55 °C.